Build to Size

Your shed, drawn to your size.

Pull the tape to the space in your yard. The framing redraws, every board is counted and priced. The whole plan is free on screen; the full set to take to the yard is $19.

Roof
Drag to turn it. Touch a board to see its cut.

The list you take to the lumberyard

Every board, sheet and box of nails, packed into the stock lengths the store sells, so nothing is a guess at the counter.

Lumber
$740
Sheet goods
$1,400
Hardware and finish
$954
Lumber and materials10x12 gable shed
  • 3PT 4x4 x 12 ft$59.94
  • 10PT 2x6 x 10 ft$119.80
  • 2PT 2x6 x 12 ft$28.96
  • 362x4 x 92-5/8" precut stud$147.60
  • 332x4 x 8 ft$143.55
  • 92x4 x 10 ft$58.32
  • 42x4 x 12 ft$31.92
  • 22x6 x 8 ft$14.96
  • 12x6 x 16 ft$16.48
  • 2PT 2x4 x 10 ft$15.96
  • 2PT 2x4 x 12 ft$19.36
  • 41x4 x 10 ft$25.92
  • 41x6 x 8 ft$27.92
  • 21x6 x 16 ft$28.96
Sheet goods
  • 6T&G plywood 3/4" 4x8$353.88
  • 6OSB 7/16" 4x8$101.88
  • 15T1-11 siding 5/8" 4x8$944.70
Hardware and finish
  • 6Shingles (bundle, 33.3 sq ft)$221.88
  • 1Synthetic underlayment (roll, 400 sq ft)$89
  • 6Drip edge 10 ft$56.88
  • 1Ridge cap shingles (bundle, ~20 lin ft)$58
  • 3Framing nails 16d (5 lb box)$74.94
  • 3Siding nails 8d galvanized (5 lb box)$83.94
  • 1Roofing nails 1-1/4" (5 lb box)$21.98
  • 20Hurricane ties H2.5A$19.60
  • 3Heavy strap hinges 8" (pair)$56.94
  • 1Gate latch / hasp$12.98
  • 2.5Gravel 3/4" crushed (cubic yard, bulk)$137.50
  • 3Exterior paint or stain (1 gal)$119.94
114 boards, about$3,094

Typical Home Depot and Lowe's shelf prices, October 2026. Your store will differ by a few percent.

The drawings

Framing drawn from the same boards the list counts. Hover a member to see what it is.

Skid PT 4x4 12' 0"Skid PT 4x4 12' 0"Skid PT 4x4 12' 0"Rim joist PT 2x6 12' 0"Rim joist PT 2x6 12' 0"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"Floor joist PT 2x6 9' 9"10' 0"12' 0"16" o.c.
A1Floor framing plan10 floor joists at 16" on center on 3 PT 4x4 skids. 3/4" tongue-and-groove plywood deck.
Floor joist PT 2x6 9' 9"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"King stud 2x4 7' 8-5/8"King stud 2x4 7' 8-5/8"Jack stud 2x4 6' 3-1/2"Jack stud 2x4 6' 3-1/2"Header ply 2x6 5' 5"Header ply 2x6 5' 5"Cripple stud 2x4 11-5/8"Cripple stud 2x4 11-5/8"Cripple stud 2x4 11-5/8"Cripple stud 2x4 11-5/8"Gable stud 2x4 1' 1-1/2"Gable stud 2x4 1' 9-1/2"Gable stud 2x4 2' 1-1/2"Gable stud 2x4 1' 5-1/2"Gable stud 2x4 9-1/2"Bottom plate PT 2x4 10' 0"Top plate 2x4 10' 0"Rafter 2x4 6' 7-5/8"Rafter 2x4 6' 7-5/8"10' 0"8' 1-1/8"10' 9-1/2" to peak
A2Front wall framingDouble doors, 5 ft opening: rough opening 62" x 77", 2x6 header on jack studs. Gable framing above at 6/12.
Skid PT 4x4 12' 0"Rim joist PT 2x6 12' 0"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Stud 2x4 7' 8-5/8"Bottom plate PT 2x4 11' 5"Top plate 2x4 11' 5"Top plate 2x4 12' 0"12' 0"8' 1-1/8"
A3Side wall framingSide walls fit between the front and back walls. Rafter tails overhang 12" past the walls.
6' 7-5/8" along the top edge plumb cut 26.6° (6/12) birdsmouth: seat 2-3/8", depth 1-1/8"
A4Rafter detailCut 20 rafters from 2x4. Plumb cuts at 26.6°. Birdsmouth seat 2-3/8", depth 1-1/8".

Not a shed? The other drawers.

The same engine draws each of these to your numbers, with the list, the cuts and the price.

Full plan set10x12 gable shed
  • Every drawing at full page size, dimensions on every member
  • The cut list on one page, grouped the way you build
  • The cutting diagram for every board
  • The materials list ready to hand to the lumberyard or load into a store cart
  • The build steps with a check at the end of each
  • Your exact size, not the nearest one we had
Total$19
Get the full plan set
Measured twice If a measurement in your plan is wrong, we fix it and send it again.

Before you dig

Do I need a permit for this shed?

120 sq ft. Many towns exempt sheds of 120 sq ft or less (some go to 200), as long as they meet setbacks from the property line. Electricity, plumbing or living space always needs a permit. Call your building department or check the town website before you buy lumber; HOA rules are separate and often stricter.

Is it cheaper to build this or buy a kit?

The lumber and materials for this plan come to about $3,094 at big-box prices. Wood kits of the same size usually cost more and use thinner framing; resin and metal kits cost less but are not the same building. Building from scratch pays when you want 2x4 walls 16 in on center, a real floor and a roof that carries snow.

What foundation does it sit on?

3 pressure-treated 4x4 skids on a 4 in crushed-gravel pad, about 2.5 cubic yards. It drains, it stays level, and the shed can be moved later. Use concrete piers if your town requires an anchored foundation.

Will the roof hold snow?

This plan uses 2x4 rafters at 16 in on center for little or no snow (up to 20 psf). In a heavier snow area, switch the snow setting in the planner and it upsizes the rafters for you. When in doubt, ask your building department for the local ground snow load.

Can I change the door?

Yes. Set the door in the planner: the rough opening, header, king and jack studs update. This plan has double doors, 5 ft opening with a 62" wide rough opening.

How long does it take?

Most first-time builders frame and roof a shed this size over two to three weekends with a helper. Siding, doors, trim and paint take another weekend.

The sizes people build most